Home
News
About GET
Equipment Compatability
Test Results
Clients
Dealers
Contacts
Poultry Farms

How is GET Green installed?

GET Green can be installed in minutes. There is no need to cut pipes, no wasted fuel and no outside power source is required.

It works on all fuel lines made of rubber, steel, stainless steel, braided steel, copper, plastic or any other combination of these materials. There is a range of GET Green products, to apply to any size of pipe.

GET Green™ installed on Appleby College's ice resurfacing machine